This is Test Post Number Two

AED provided piping and electrical detailed design services to support tank farm berm improvements for a refinery. The brownfield project required rerouting of existing benzene piping due to the modifications and involved the development of isometrics and piping layout drawings. AED’s electrical team designed a heat trace system for the newly installed piping to prevent the benzene from freezing.

Recent Comments

No comments to show.

Powered by Our People

AED is part of the Allied Resources Group (ARG). Our family of technical companies offer a collaborative environment, flexible work opportunities, and a family-centric culture.